Tuesday, February 8, 2011

Rap Song About Blue Blockers

decrease

Today it was so far - by 13 clock we had the acceptance. It was quite a chaos, because it was next to the site manager, the company and the company Dörau Breede present to us more or less simultaneously to give the heating and electrical training.

refereed to almost 2 hours of acceptance, we each "bite" so that in the end were still about a dozen minor shortcomings on our part objected to. This includes things like enact doors and windows, a non-functioning shutters on the ground or small scratches on a window. The two main shortcomings were the lack of of the return handrail at the output of the bottom rack stairs, the lack of 67cm wide catwalk in the pointed bottom (over the entire length of the house) and differs from the sampling faucets. But the latter will be replaced soon by us to seek out new.

197 days after construction has Hr. Ramberg then exchanged at about 15:15 the clock Bauzylinder and we get our own house keys! Thus we have again the house right in our own home!

Starting tomorrow, Wednesday, gets our house then his inner coat.

tiles in imitation wood living room (tower)

view living room

view in the hallway

guest bathroom

finally fits the shower

Bathroom floor

Saturday, February 5, 2011

Zac E Cody Music Jordin Sparks

MZF fire Babenhausen

A multi-purpose vehicle to take additional equipment as a command vehicle was from the fire department Babenhausen (County Unterallgäu) commissioned and then handed over to us.
signal conditioning RTK7 HELLA LED front, HELLA OWS7 with traffic warning device at the rear, rear extension with shelves, extended work table, office cabinet with drawer for fax / printer, sine converter and much more complete the facilities.

Thursday, February 3, 2011

Mmorpg Free Games Furry

MTW DRC Dettingen

The DRC Dettingen / Erms (district of Reutlingen) could pick up a new MTW we

Wednesday, February 2, 2011

Do You Paint The Genitals When Body Painting

doors, tile, drywall

It is slowly but surely coming to an end. And so we have a few days earlier than planned to get already installed the front door panel and interior doors.


now go up the work in the bathrooms, so that they are almost complete. Unfortunately, the wrong taps were installed. In any case, this is not the one we had taken a look at the sample.

Our painter is the week been busy and is ready almost complete with spatulas. And our living room but you must perform the skirting boards. The rest is tiled finish. And since Tuesday is

we got rid of the Stairway.