After last week, Monday (12/12/2010) The temporary heating has not yet broken down, we have Roth faced with the alternative, either we want from the temporary or Roth covers the costs incurred since 12/10/2010. By that Friday we had so we agreed to pay the costs. Our construction manager was the concern on Tuesday at the board and there you agreed to the reimbursement. There was a deadline to make the installation of heating it on Monday and Tuesday are not.
But how then is wait, then went on but once again pretty quick. On Thursday was the first tile there and the heating area tiled. And on Friday came even as stock storage and geothermal heat pump.
And lo and behold - since Friday night running the heater. We were Saturday at the construction site and it was really nice and warm DIR. So now it's happily ever after with the daily airing.
The geothermal heat pump (above) and the storage space (below) with 250 l |
side view |
But is not quite as garvierend. The window in the utility room we got on quite well, though not quite as planned on paper. Is yes, but only the HWR.
detailed view of the tiles. |
Finally, two small winter impressions of our house.
0 comments:
Post a Comment