Saturday, January 29, 2011
Home Made Graduation Centerpiece
to sell a commercial building
sell because of the new building our current business building of approximately 450 square meters warehouse / workshop / production in two linked halls (new hall model 2008) and enough office space with social space - Land 1000 square meters with garage. Conveniently located in the commercial area on the outskirts of the village Baier, at 1 minute from the motorway exit.
Thursday, January 27, 2011
Appropriate Things To Write In A Wedding Card
Wednesday, January 26, 2011
Trade Pokemon On Ipod Touch
Sunday, January 23, 2011
Taa Lease Contract 2010
tiles
The last week was dominated by the tiles. Thus, last week, the floors in the utility room, hallway and guest bathroom, and tiled the walls in the bathrooms. Next week to work then the tiles be completed.
Last Thursday we had to unfortunately suffer from the Badbordüre final approval. The ones we had chosen was, unfortunately, too narrow. And in the short time we have not found any new ones. So we have reluctantly decided to install any borders in the bathroom.
has also begun to create the design for our bath. This is to be installed on Monday along with the shower.
We are curious. And finally you see progress again in the house.
PS: For tips and tricks for cleaning the tiles from the current construction dust, we would be grateful!
The last week was dominated by the tiles. Thus, last week, the floors in the utility room, hallway and guest bathroom, and tiled the walls in the bathrooms. Next week to work then the tiles be completed.
Last Thursday we had to unfortunately suffer from the Badbordüre final approval. The ones we had chosen was, unfortunately, too narrow. And in the short time we have not found any new ones. So we have reluctantly decided to install any borders in the bathroom.
has also begun to create the design for our bath. This is to be installed on Monday along with the shower.
We are curious. And finally you see progress again in the house.
PS: For tips and tricks for cleaning the tiles from the current construction dust, we would be grateful!
design for Bath |
bathroom floor |
Here comes out the shower |
left side of the kitchen |
The floor in the kitchen |
right side of the kitchen |
guest bathroom already grouted |
floor in the guest bathroom with cleaning needs |
Monday, January 17, 2011
Color Chart For Koleston Perfect
former Prime Minister Dr . Beckstein visited
At a briefing and a tour of the company were we are now the Bavarian prime minister and former member of the Bavarian Parliament (Landtag), Dr. Günther Beckstein , the body responsible for the constituency MdL Christa Matschl, 1 Mayor of Baiersdorf and CSU local association chairman Dorothea Neubauer, welcoming us. In small groups, the company and the activities presented and led a discussion on general economic conditions.
were In a subsequent tour of the company visited several cars under construction and the visitors were able to answer many questions about an everyday activity is certainly not a company. The former prime minister proved to be an extremely knowledgeable was, but said that the theme of fire and disaster are the direct responsibility of a long-time interior minister in Bavaria.
At a briefing and a tour of the company were we are now the Bavarian prime minister and former member of the Bavarian Parliament (Landtag), Dr. Günther Beckstein , the body responsible for the constituency MdL Christa Matschl, 1 Mayor of Baiersdorf and CSU local association chairman Dorothea Neubauer, welcoming us. In small groups, the company and the activities presented and led a discussion on general economic conditions.
were In a subsequent tour of the company visited several cars under construction and the visitors were able to answer many questions about an everyday activity is certainly not a company. The former prime minister proved to be an extremely knowledgeable was, but said that the theme of fire and disaster are the direct responsibility of a long-time interior minister in Bavaria.
Thursday, January 13, 2011
Nintendo Club Earn More Coins
blower door test, discussion of open issues
The year is still fresh in and it goes on the site.
On Tuesday morning, 01/11/2011 has been with us through out the blower-door test. At the same time we had agreed with our construction manager Mr. Ramberg on site to clarify the remaining outstanding issues from last year. On the whole it was about this:
The blower door test, which ran in the meantime, was quite good. Our measured result was 2.2, with the upper limit a value of 3.0. The value obtained is improving but still as soon as the right door panel was set up and the windows are adjusted. Then the value is approximately 1.7 to 1.8 are, which means about 40% below the specified value.
We have also discussed with Mr. Ramberg its further progress. This provides the time like this: In the 3rd
and 4 KW (17.1 .- 28.1.) Be made the tile work. The following week, then to the inner doors and the stairs are delivered and installed. The goal is that we are in mid-February then can perform the handover.
This means that we can in the meantime tile the living room, filling the walls and ceiling (can), and painters. Sometime in between then we move the floor upstairs. Our move we have now for the end Scheduled in February! The apartment will be terminated and thank God we have as of 3/1/2011 a day care center seat for our sunshine!
It is now, therefore, also the move to organize a "sideline". The relocation of the phone as we have already in place led.
still a hard work on the program. We get our tiles! All 109 tiles packages on 3 pallets. And the all want to be taken together with the house. Phew.
The year is still fresh in and it goes on the site.
On Tuesday morning, 01/11/2011 has been with us through out the blower-door test. At the same time we had agreed with our construction manager Mr. Ramberg on site to clarify the remaining outstanding issues from last year. On the whole it was about this:
- remove existing plaster damage
- aside the damage to the casing of the storage tank of heating
- inspection and repair of defects in the drywall (as part of small distances between the joints, faulty sections of the sheet-rock some loose boards, etc.)
The blower door test, which ran in the meantime, was quite good. Our measured result was 2.2, with the upper limit a value of 3.0. The value obtained is improving but still as soon as the right door panel was set up and the windows are adjusted. Then the value is approximately 1.7 to 1.8 are, which means about 40% below the specified value.
We have also discussed with Mr. Ramberg its further progress. This provides the time like this: In the 3rd
and 4 KW (17.1 .- 28.1.) Be made the tile work. The following week, then to the inner doors and the stairs are delivered and installed. The goal is that we are in mid-February then can perform the handover.
This means that we can in the meantime tile the living room, filling the walls and ceiling (can), and painters. Sometime in between then we move the floor upstairs. Our move we have now for the end Scheduled in February! The apartment will be terminated and thank God we have as of 3/1/2011 a day care center seat for our sunshine!
It is now, therefore, also the move to organize a "sideline". The relocation of the phone as we have already in place led.
still a hard work on the program. We get our tiles! All 109 tiles packages on 3 pallets. And the all want to be taken together with the house. Phew.
Subscribe to:
Posts (Atom)