Saturday, January 29, 2011

Home Made Graduation Centerpiece

to sell a commercial building

sell because of the new building our current business building of approximately 450 square meters warehouse / workshop / production in two linked halls (new hall model 2008) and enough office space with social space - Land 1000 square meters with garage. Conveniently located in the commercial area on the outskirts of the village Baier, at 1 minute from the motorway exit.
Especially suitable for car companies, tire dealers, wholesalers, retailers ... Truck competition arena, lift. 2. Stock as additional storage space and much more ... DSL 16000
available, alarm system, telephone system, power, fully heated, garages, top customer frequency opposite ALDI, beside and NORMA NET!
If interested, simply visit any time. Those who have no interest, should it please tell people might be interested ;-)
Available from November 2011 - Sale of the real estate department of the Sparkasse Erlangen - more info here:
http://forward.immobilienscout 24.de/9004STF/58293875 is24EC = IS24

Thursday, January 27, 2011

Appropriate Things To Write In A Wedding Card

electrical, tiles, sanitary

In recent days started with the completion of electrical and plumbing. Also, the tile was still hard. Here is a small Standings:


Illuminated entry




a corner bathtub

Bad

The shower

Wednesday, January 26, 2011

Trade Pokemon On Ipod Touch

MZF fire Eltmann

Die? Fire Eltmann was able to take the long-awaited MZF with us and transfer to the county Haßberge

Sunday, January 23, 2011

Taa Lease Contract 2010

tiles

The last week was dominated by the tiles. Thus, last week, the floors in the utility room, hallway and guest bathroom, and tiled the walls in the bathrooms. Next week to work then the tiles be completed.
Last Thursday we had to unfortunately suffer from the Badbordüre final approval. The ones we had chosen was, unfortunately, too narrow. And in the short time we have not found any new ones. So we have reluctantly decided to install any borders in the bathroom.
has also begun to create the design for our bath. This is to be installed on Monday along with the shower.
We are curious. And finally you see progress again in the house.

PS: For tips and tricks for cleaning the tiles from the current construction dust, we would be grateful!

design for Bath

bathroom floor

Here comes out the shower


left side of the kitchen

The floor in the kitchen

right side of the kitchen

guest bathroom already grouted

floor in the guest bathroom with cleaning needs

Monday, January 17, 2011

Color Chart For Koleston Perfect

former Prime Minister Dr . Beckstein visited

At a briefing and a tour of the company were we are now the Bavarian prime minister and former member of the Bavarian Parliament (Landtag), Dr. Günther Beckstein , the body responsible for the constituency MdL Christa Matschl, 1 Mayor of Baiersdorf and CSU local association chairman Dorothea Neubauer, welcoming us. In small groups, the company and the activities presented and led a discussion on general economic conditions.
were In a subsequent tour of the company visited several cars under construction and the visitors were able to answer many questions about an everyday activity is certainly not a company. The former prime minister proved to be an extremely knowledgeable was, but said that the theme of fire and disaster are the direct responsibility of a long-time interior minister in Bavaria.

Thursday, January 13, 2011

Nintendo Club Earn More Coins

blower door test, discussion of open issues

The year is still fresh in and it goes on the site.
On Tuesday morning, 01/11/2011 has been with us through out the blower-door test. At the same time we had agreed with our construction manager Mr. Ramberg on site to clarify the remaining outstanding issues from last year. On the whole it was about this:
  1. remove existing plaster damage
  2. aside the damage to the casing of the storage tank of heating
  3. inspection and repair of defects in the drywall (as part of small distances between the joints, faulty sections of the sheet-rock some loose boards, etc.)
The addressed shortcomings, especially when dry, will be remedied in the coming week, with us, we convince ourselves again on the ground of freedom of the mold dry construction. In some places are the sheet-rock that is affected. Probably it is because the batten has been damp at the time of installation and the sheetrock was screwed despite the lack of heating. But that will (hopefully). Committed was that we remove sample confinement plates and check how far the infestation has spread. Then this will of course put back in order.

The blower door test, which ran in the meantime, was quite good. Our measured result was 2.2, with the upper limit a value of 3.0. The value obtained is improving but still as soon as the right door panel was set up and the windows are adjusted. Then the value is approximately 1.7 to 1.8 are, which means about 40% below the specified value.


We have also discussed with Mr. Ramberg its further progress. This provides the time like this: In the 3rd

and 4 KW (17.1 .- 28.1.) Be made the tile work. The following week, then to the inner doors and the stairs are delivered and installed. The goal is that we are in mid-February then can perform the handover.

This means that we can in the meantime tile the living room, filling the walls and ceiling (can), and painters. Sometime in between then we move the floor upstairs. Our move we have now for the end Scheduled in February! The apartment will be terminated and thank God we have as of 3/1/2011 a day care center seat for our sunshine!

It is now, therefore, also the move to organize a "sideline". The relocation of the phone as we have already in place led.

still a hard work on the program. We get our tiles! All 109 tiles packages on 3 pallets. And the all want to be taken together with the house. Phew.